新東名高速道路 豊川橋(右岸)工事 場所:愛知県新城市有海地区
|
|
|
|
|
|
|
施工延長 53.4m(上り線) 61.8m(下り線) 最大径間 45m (設計上載最大荷重760t) 高さ 約23m(下床ーGL) 幅員 11.4m(上下線共)
|
|
|
|
|
|
|
ToYoKaWa Bridge(On the left bank of the Toyokawa-Riv) A part of the Tokyo-Naogoya 2nd highway's project. Location:Arumi, Shin-shiro city, Aichi Prf. JPN
|
|
|
|
|
|
|
Supporting Length: Bound for Tokyo 53.7m(176') Bound for Nagoya 61.8m(203') Max pier-to-pier Span: 45.0m(147.5') (Designed maximum load : 760tons per span) Hight:Ground Level to Bridge bottom 23m(76.7') Width: 11.4m per lane |
|
|
|
|