仙台市南蒲生浄化センター 災害復旧工事
工事データ/ GL〜橋面迄の高さ:7.6m 橋長:527.5m(総延長) 幅員:12.0m 許容上載荷重:898KN (揚力80tonのクローラクレーンを想定)
|
|
|
|
|
|
|
MINAMI-GAMOU Sewage water Disposal plant of SENDAI-city. (North-East Japan disaster restore project)
Data/ Hight : 7.6m (25.3') Length : 527.5m (1,758') ...3 deckes total Width : 12.0m (40') Designing Top load : 898KN (For Capability 80ton's crawler crane) |
|
|
|
|
|