HIROSE GIKEN CO., LTD.
JP
|
EN
Company
Philosophy
Message
Corporate Profile
History
Access
Products
Our Strengths
Case Studies
Contact
Company
Philosophy
Message
Corporate Profile
History
Access
Products
Our Strengths
Case Studies
Contact
JP
|
EN
Post-tensioned Continuous PC Girder Bridge (Otsuyagawa Bridge PC Superstructure, Inbound Line — Second Tomei Expressway)
Details
Bridge length L: 241 m, width W: 17.43 m
Longest span L: 52.5 m
Maximum shoring height H: 25 m
Maximum reaction per shoring column: 427.51 kN
Back to Case Studies
Contact
Get in touch
If you have any questions or inquiries,
please feel free to contact us.
Contact form