JP|EN

Post-tensioned Continuous PC Bridge (Toyokawa Bridge, Right Bank — New Tomei Expressway)

Details Construction length: 53.4 m (inbound line) / 61.8 m (outbound line)
Maximum span: 45 m (maximum design imposed load 760 t)
Height: approx. 23 m (ground level to soffit)
Width: 11.4 m (both directions)

Contact
Get in touch

If you have any questions or inquiries,
please feel free to contact us.