Post-tensioned Continuous PC Bridge (Toyokawa Bridge, Right Bank — New Tomei Expressway)
Details
Construction length: 53.4 m (inbound line) / 61.8 m (outbound line) Maximum span: 45 m (maximum design imposed load 760 t) Height: approx. 23 m (ground level to soffit) Width: 11.4 m (both directions)
Contact
Get in touch
If you have any questions or inquiries,
please feel free to contact us.