JP|EN
RöRo S-50

RöRo S-50

Products Detail
RöRo S-50

High capacity of 500 kN. The flagship shoring that supports large-span, high-load sites.

A pipe-column system shoring with an allowable vertical capacity of 500 kN (50 tf). As a column that replaces conventional square columns and bent members for steel bridges, it always offers a rational and safe design. It has an extensive track record in prestressed-concrete (PC) bridge work as well as large-scale building construction.

  • Labor Saving and Faster Construction

    Because it requires fewer members and less work, it can be assembled and dismantled by a small crew. It also takes up less space during assembly, making the site easier to keep tidy and leading to a safe, clean workplace. Each member is manufactured with high precision, allowing quick and easy assembly and dismantling.

  • Safety

    The main members use material equivalent to high-tensile steel pipe STK500, providing light weight, high strength and a high level of safety. During assembly and dismantling, the basic configuration is a self-standing box structure with a simple shape that needs no auxiliary members. By installing intermediate scaffolding, scaffold boards can be laid to secure a safe working environment.

  • Height Adjustment and Lateral Movement

    The long-stroke upper and lower jacks allow adjustment to any height, accommodating various ground slopes and inclinations of the superstructure. After the deck slab is placed and the upper formwork has been stripped, fitting dedicated rollers between the sill girder and the base jack turns the shoring into a movable platform.

  • One-Stop Service

    Only Hirose Giken handles everything, RöRo shoring together with heavy temporary steel materials, from design to delivery as a single "One Stop" service tailored to your needs, anywhere in Japan. Everything is provided on a rental basis (except bolts), supporting our customers in terms of both economy and the environment.

RöRo S-50
Case Studies

Case

Construction Access Bridge (Wabuka Trestle, Susami Town)

Working Platform for Dam Construction (Inami Town, Hidaka District, Wakayama)

Caisson Suspension Frame (Teshio Ohashi Bridge Substructure Works)

Continuous PC Box-girder Bridge (Hitokura Ohrouji River Bridge Superstructure, Kawanishi Interchange Line — Nishiuneno, Kawanishi City, Osaka)

Contact
Get in touch

If you have any questions or inquiries,
please feel free to contact us.